News
The Zhoukou–Luohe Natural Gas Pipeline Project has successfully entered trial operation.
The Zhoukou–Luohe natural gas transmission pipeline project successfully commenced trial operations on August 23, 2023.
The Zhouluo Pipeline Project stretches approximately 103.85 km, running from the Luohe Distribution Station of the Pingwu–Luohe Local Branch Line of the Second West-to-East Gas Pipeline in the west to the Huaiyang Distribution Station of the First West-to-East Gas Pipeline in the east. Along the route, the project includes the Luohe Initial Station, the Xiping Distribution Station, the Zhoukou West Distribution Station (including Valve Chamber No. 2), the Zhoukou East Distribution Station, Valve Chamber No. 1, and Valve Chamber No. 3. The pipeline has a nominal diameter of DN600, a design pressure of 6.3 MPa, and a designed annual maximum gas transmission capacity of 2 billion cubic meters.