Solution for Regulating Gas Injection and Brine Discharge in Salt-Cavern Gas Storage Facilities

Following the completion of cavity formation at the Jintan Salt‑Cavern Gas Storage Facility in Jiangsu, gas injection and brine‑displacement operations are required. During this process, the compressor must deliver approximately 300,000 standard cubic meters per day, whereas each of the injection compressors supporting the Jintan storage facility has a capacity of about 1.5 million standard cubic meters per day. Adding another small‑capacity compressor would inevitably entail substantial additional costs. Consequently, optimizing the utilization of the existing infrastructure to adjust compressor output and enhance the economic efficiency of gas injection and brine displacement has become a critical priority.
Purihaote Energy, through sophisticated calculations and iterative adjustments, implemented a new optimization scheme that expands the compressor’s discharge‑capacity regulation range from 270,000 standard cubic meters to 940,000 standard cubic meters within an inlet pressure of 3.0–6.0 MPa. This solution meets the gas‑flow‑rate control requirements during the injection and brine‑discharge phases at the Jintan Gas Storage Facility, delivering significant economic benefits.
Environmental management system certificate
Occupational Health and Safety Management System Certification
Quality management system certification
Zhongguancun high-tech enterprises
Honor and qualification