Solutions and Cases
Coalbed Methane Boosting and Gathering Project
With approval from the Shanxi Provincial Development and Reform Commission, Shanxi International Energy Group Gas Transmission and Distribution Co., Ltd. has successfully completed the Heshun–Changzhi and Heshun–Shouyang–Taiyuan coalbed methane pipeline projects, along with their associated facilities—including two booster and gathering stations in Licheng and Tuba. This project is a key initiative for Shanxi Province, designed to handle an annual gas transmission capacity of 495 million cubic meters. The pipeline network spans three cities—Taiyuan, Jinzhong, and Changzhi—and 15 counties and districts, undertaking the construction and operation of the eastern four‑gas pipeline network in Shanxi. Building on the Taiyuan–Changzhi East Trunk Line, its connection to the Yuji Line, and participation in the Linlin Line project, the system links other trunk pipelines and regional networks, while also tapping additional domestic gas sources and integrating coalbed methane resources from the Qinshui and Hedong major coalfields.
Purihaote Energy Services, leveraging its robust technical expertise and systematic service management framework, provides comprehensive support for the smooth commissioning and operational management of the pressure‑boosting and gas gathering stations involved in this project. It also oversees the full‑system commissioning and trial operation of the facilities, day‑to‑day production and operational management, equipment operation, routine maintenance and upkeep, troubleshooting, technical training, as well as the preparation and development of documentation and procedural frameworks for the production and operations management system.
Previous page
Next page
Previous page
Next page
Environmental management system certificate
Occupational Health and Safety Management System Certification
Quality management system certification
Zhongguancun high-tech enterprises
Honor and qualification